Inslope Repair to Begin on U.S. Highway 14A Near Broken Boot Gold Mine Southwest of Deadwood

For Immediate Release: 
Friday, Sept. 8, 2026

Contact: 
Justin Smith, Project Engineer, 605-381-4035

Inslope Repair to Begin on U.S. Highway 14A Near Broken Boot Gold Mine Southwest of Deadwood

DEADWOOD, S.D. – Beginning on Tuesday, Sept. 8, 2026, a project is scheduled to repair the inslope adjacent to Deadwood Creek and to replace a pipe on U.S. Highway 14A at the Broken Boot Gold Mine southwest of Deadwood.

Two-way traffic will be maintained during the project. A 10-foot width restriction will be in place for both lanes of traffic. A signed over-width detour will be routed to U.S. Highway 85. A weekend closure for pipe installation will be announced in the future.

The prime contractor on the $550,000 project is Mainline Contracting, Inc. from Rapid City, SD. The project completion date is Friday, Oct. 30, 2026.

About SDDOT:

The mission of the South Dakota Department of Transportation is to efficiently provide a safe and effective public transportation system.

For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, please visit https://sd511.org or dial 511.

Read more about the innovative work of the SDDOT ahttps://dot.sd.gov.

-30-

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

50 States Today

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.